Docket Status


as of October 16, 2026
    
Docket No.;
Package Model Name;
Requested Action;
Requesting Office
Date
Requested

(m/d/y)
Last Action Completed;
Date
Next Action Required Comments
DOE PCP Applicant NRC DOT
18-42-0000
N/A
Request for Technical Assistance develop 10 CFR Part 71 matrix
DOE-PCP 
Not specified  Received SRNL draft 7/12/2018. Populate matrix.   N/A  N/A  N/A Request to develop a 10 CFR Part 71 applicability matrix for DOE.  
19-64-9982
9982
Request for new DOE CoC
SR 
Not specified  On 10/13/2026, received SRNL Sept. spending report. Waiting on SRNL pre-application submittal.

Send FY26 monthly  consolidated report to DOE PCP Manager.

SRNL to provide formal target dates to HCO through SR for pre-application call, package performance testing, and SARP submittal.

N/A N/A  Request from SR for new DOE CoC of the Model 9982 Type B fissile package design for "small gram quantities" of RAM. 
21-58-0000
G 461-1
Technical Support - Request to update Guide for O 460.1D
EM-4.24
9/30/2022  Received onsite transfer and TSD papers 2/3/2022. Review drafts.  N/A N/A N/A  Request from the DOE HCO via DOE PCP Manager to update Guide to Order 460.1A as RAMPAC pages based on O 460.1D.  
22-16-0000
N/A
Technical Support
EM-4.24 
9/30/2023  On 3/8/2023, received SRNL comments. Review comments  Waiting on comments to update HM primer.  N/A  N/A  Request from DOE PCP Manager to update the 2016 ORO/SC HM Primer. 
23-06-0000
N/A
Technical Assist
EM-4.24 
9/30/2023  On 10/17/2022, docket opened to revise SARP submittal checklist.  Waiting on draft.  LLNL to submit draft checklist.  N/A  N/A Request from DOE PCP Manager to update SARP Completeness Checklist. 
24-35-0000
N/A
Tech Assistance
DOT 
Not specified On 6/22/2026, Teams call with DOT and ORNL SME to status ORNL support to the IAEA  NORMEX Working Group. Waiting on status summary from ORNL.  N/A N/A Provide DOE with task support actions  Request from DOT (Matt Sumrall) for subject matter expert support for developing new values for normally occurring radioactive material.
26-07-9291
Liqui-Rad (LR) Transport Unit Package
TN Americas 
10/1/2026  On 10/16/2026, completed initial draft CoC. Waiting on LLNL TRR. Waiting on draft CoC. N/A  N/A Request from TN Americas (D. Shaw) to amend DOE CoC 9291. 
26-08-9519
SAFESHIELD 2999A
NA-LA
Not specified. On 5/21/2026, connected LANL and ORNL SME to produce report for DOT. Waiting on LANL technical justification for review. ORNL to prepare proposed A-values and technical justification for LANL.  N/A  Waiting on application.  Request from NA-LA (M. Heil) for A-values for unlisted isotopes for  Terbium and Dysprosium radionuclides.
26-12-0000
N/A
EM-4.24 
10/15/2026  Received Sept. reports:  LLNL (9/30), INL (10/12), SRNL & NV (10/13), ORNL (10/14), SNL (10/16). Waiting on Sep staff reports. Submit report by  COB on 15th of the month. N/A N/A Request from EM-4.24 (Edge/Cable) for FY26 funding request. 
26-28-0000
New SP
OREM 
Not specified.  On 8/6/2026, OREM reported this task was a lower priority but the modified application is being processed by UCOR for submittal. Waiting  on application to modify SP 21977. Prepare an  application to modify SP 21977. N/A  Waiting on application submittal from DOE PCP  Request from OREM (S. Clemons) for new DOT SP - Lithium Shields. 
26-42-9904
RTG Package
CoC amendment and renewal
ID
 10/31/2026 On 10/5/2026, routed to DOE PCP Manager for HCO approval. Waiting on HCO. Review draft CoC.  N/A  N/A  Request from ID (M. McAnulty) for simple amendment and renewal of DOE CoC 9904. 
26-45-0000
DOE Exemption E-1407 Extension
CBFO
10/31/2026  On 8/6/2026, docs routed to DOE PCP Manager for HCO approval. Waiting on HCO. N/A  N/A  N/A Request from CBFO (D. Smith) to extend the expiration date of their exemption to DOE Order 460.1D.
26-46-9979
9979
DOE CoC Amendment
ID 
Not specified.  On 10/12/2026, ANL reported they are drafting Q1s. Waiting on ANL Q1s.  Waiting on review questions/comments.  N/A  N/A Request from SR (L. Sobus) to amend DOE CoC to authorize use of the package for shipment of INL contaminated flush salt. 
26-48-0000
Tech. Assistance 
DOT Interpretation
NE-8 
Not specified.  On 10/15/2026, DOT reported they expect to issue an interpretation or equivalent letter of approval by 10/31/2026.  Waiting on DOT. Waiting on DOT. N/A  Review request.  Request from NE-8 (E. Bickford) for technical assistance for a DOT Interpretation of 49 CFR 173.22(c). 
26-49-0000
Tech Assistance
DOT Report
DOT-SP 21235
RL 
Not specified. On 9/9/2026, notification report submitted to DOT.  Waiting on DOT acknowledgement. Waiting DOT comments.   N/A Acknowledge receipt of the report.  Notification from RL (G. Melo) of a violation with Section condition 7.b.(2) of DOT-SP 21235 - violation is reportable to DOT per the SP.
26-51-9979
9979
DOE CoC letter amendment 
Not specified. On 10/13/2026, letter amendment issued. Docket closed. N/A N/A  N/A  Request from SR (L. Sobus) to amend DOE CoC to authorize use of out-of-spec plugs in the 30 gallon drum lid for shipment from Y-12.
26-52-0000
N/A
EM-4.24 
 9/1/2026 On 10/13/2026, sent consolidated report to EM-4.24. Waiting on acknowledgment and request for additional information.  N/A N/A  N/A Request from EM-4.24 (E. Edge) for FY27 funding estimate. 
27-01-0000
Various
Tech. Assitance
CF-11 
Not specified. On 10/14/2026, sent revised list to CF-11.  Docket closed. N/A N/A  N/A Request from CF-11 (C. Bridgewater) for list on NRC CoCs where DOE/NNSA is the CoC holder. 
24-04-9228
GE-2000
DOE CoC Letter Amendment
SC 
 6/1/2027  On 10/15/2026, SRNL started their independent technical review. Waiting on SRNL Q1s or TRR.  Waiting on Q1s. N/A  N/A  Request from SC-OSO (H. Radke) for DOE CoC letter amendment to ship damaged HFIR (outer) fuel element.  



Office of Environmental Management

1000 Independence Ave. SW
Washington DC 20585
202-586-7709