Docket No.;
Package Model Name;
Requested Action;
Requesting Office
Date
Requested

(m/d/y)
Last Action Completed;
Date
Next Action Required Comments
DOE PCP Applicant NRC DOT
16-45-9315
ES-3100
Revision to DOE CoC
NA-​233
Not specified
Received Q1 responses 7/3/2018.
Review Q1 responses.
Waiting on PCP review.

N/A
N/A Request to revise DOE CoC for numerous items.
17-20-9979
9979
Request for Letter Amendment
SRRO 
 Not specified Sent application to ANL for review 4/10/2018  ANL to review application. Waiting on PCP Q1s.  N/A  N/A  Request to amend DOE CoC 9979 to allow LEU shipment that exceeds the current content limit. 
17-32-9975
9975
DOE CoC Violation
LANL 
Not specified.  Sent comments to PCP Manager 5/13/2018 from review of NNSA Independent Assessment Report.  Waiting on DOE CO.  Waiting on DOE CO.  N/A  N/A  Notification of violation of DOE CoC 9975. 
17-43-9601
CASTOR
Request for Technical Assistance
DOE-EM 
Not specified  Status update requested from GNS on 6/25/2018 and received 6/27/2018.  Leakage test specification submittal to DOE  proposed August 2018. Waiting on GNS submittal for DOT. Preparing funding for LLNL and submit alternate Leak-Test method .  Waiting on alternate Leak-Test method submittal from DOE for GNS. Waiting on alternate Leak-Test method submittal from DOE for GNS. GNS to prevent alternate method to leak testing existing 7packages. 
17-46-0000
N/A
Request for Technical Assistance
EM-4 
Due by the 15th of each month.  Received report: 8/7/2018 (ORNL). Waiting on July reports, due 8/15. N/A  N/A  N/A  Request for PCP staff scope and information. 
18-15-9979
9979
Limited Shipment Authorization
LAFO
Not specified Memo issued by HCO to LAFO 12/14/2017.  None.  Report shipment to HCO. N/A  N/A  Request to authorize LANL for limited shipments. 
18-18-0000
N/A
Request for technical assistance for DOT interpretation.
Y12-NSC 
Not specified   Conference call with DOT 8/8/2018. DOT is preparing a letter of interpretation unfavorable to NPO's position.  Waiting on DOT letter.  Waiting on DOT letter.  N/A  Waiting on submittal from PCP.  Request for Assistance and Technical Basis for the Determination of the
Toxicity of Highly Enriched Uranium at the Y-12 National Security
Complex
18-22-9204
​10-160B
Request for CoC Content Amendment
ID

Not specified Received revised calculation 8/8/2018. Review application and issue Q1s.  Target date 8/31/2018.  Waiting on Qs. N/A  N/A  Request to amend DOE CoC for IBL 437C Blood Irradiators with activity up to 5100 Ci of Cs-137
18-24-9315
9315
Limited Shipment Authorization
LAFO

Not specified First shipment completed 5/7/2018; HCO notified by LAFO  6/14/2018.  Waiting on shipment completion notification.  Report shipment to HCO. N/A  N/A  Request to authorize LANL for limited shipment. 
18-25-9516
9516
Limited Shipment Authorization
LAFO
Not specified First shipment completed 4/4/2018; HCO notified by LAFO  6/14/2018. 
Waiting on shipment completion notification.  Report shipments to HCO. N/A  N/A  Request to authorize LANL for limited shipments. 
18-29-0000
Various
Memo to Carlsbad
EM-4.24 
Not specified.  HCO sent memo to CBFO 2/22/2018  Waiting on response.  Preparing response.  N/A  N/A  Memo to CBFO regarding non-compliance with Order 460.1D user registration and QAP approval requirements.
18-31-9979
9979
Limited Use Authorization
LAFO 
3/14/2018  HCO authorization memo sent to LAFO with attachment 4/26/2018.  Corrected attachment sent 4/27/2018.  Waiting on gas generation revised  calculation review from Docket 17-15-9979. N/A   N/A  N/A  Request to reinstate LANL to use 9979 packaging for storage.
18-32-9981
9981
Request for new DOE CoC
SR
Not specified. Received 41 of 42 responses and effected page changes on 7/27/2018. Sent ​Q1 responses to LLNL on 7/30/2018. Preparing gas-gen, shielding, and nuclear criticalitysafety calcs. or revisions for submittal by 8/17/2018. N/A  N/A  Request to certify new Type A fissile package design. 
18-33-0000
Various
Request to update package options
HCO/SR 
Not specified  Sent package contacts and review estimate to PCP Manager 6/13/2018 for EM-4.23.  Waiting on further instructions.  N/A  N/A  N/A  Request from HCO to update package options for SRS canisters. 
18-35-9979
9979
Request for content amendment
SR 
Not specified  Received Q0 responses 6/21/2018. Resume review of the application.  Waiting on Qs. N/A   N/A Request to amend DOE CoC to authorize TRISO fuel.
18-39-0000
Request to renew DOT SP 14283
EM-MOAB
Not specified  DOT acknowledged  receipt of DOT Special Permit ​renewal request 6/7/2018. Waiting on DOT. Waiting on DOT.  Estimated response date is 9/30/2018.   N/A  ​Review renewal application.  Request to renew DOT Special Permit. 
18-40-9519
SafeShield 2999A
Limited Shipment Authorization
LAFO
Before 6/28/2018.  Approval memo issued by HCO   5/30/2018.  Waiting on shipment completion notification. Report shipments to HCO.  N/A  N/A  Request to authorize LANL for limited shipments.  
18-42-0000
N/A
Request by PCP to develop 10 CFR Part 71 matrix
DOE-PCP 
Not specified  Received SRNL draft 7/12/2018. ​Populate matrix.   N/A  N/A  N/A Request to develop a 10 CFR Part 71 applicability matrix for DOE.
18-43-9315
ES-3100
Revision to DOE CoC
NA-233 
 8/27/2018 Draft CoC and SER concurred, without comment, by ANL on 8/10/2018 Waiting on applicant's  concurrence with draft CoC.  Review draft CoC.   N/A  N/A  Request to amend the DOE CoC to authorize the package for low density oxide for air shipment. 
18-44-0000
N/A
FY19 Budget Plan
EM-4.24 
7/31/2018  Received input from ANL (7/30/2018), PNNL and ORNL (7/31/2018), LLNL (8/1/2018), NV (8/7/2018), and SRNL (8/9/2018). Compile input.  N/A  N/A  N/A  Request for FY19 budget plan input. 
18-45-9315
ES-3100
Revision to DOT CAC
NA-233 
 9/4/2018 Request received from NA-233 6/28/2018.  Docket opened 7/18/2018.  Waiting on ANL review of Docket 18-43-9315.  Waiting on PCP.  N/A  N/A  Request to amend the DOT CAC to authorize the package for low density oxide for air shipment. 
18-46-5797
HFIR
Revision to NRC CoC
ORO 
Not specified  PCP Manager's Cover Letter for NRC submittal sent to ORNL 7/30/2018. Waiting on NRC RAIs.  Waiting on PCP/NRC.  Project Manager waiting on application.  N/A  Request to amend NRC CoC based on consolidated SAR. 
18-49-9980
9980
Renewal of DOE CoC
SR
Not specified  Transmittal memo, CoC, approval record, and SER routed to HQ 8/10/2018.  Waiting on HCO.  Waiting on CoC.  N/A  N/A  Request to renew DOE CoC for 5-years. 
18-50-9975
9975
Renewal of DOT CAC
SR
 
Not specified  Transmittal letter routed to PCP Manager 8/10/2018.  Sign letter.  Waiting on CAC  N/A  Waiting on request letter from DOE.  Request to extend the expiration date and amend DOT CAC, based on endorsement of DOE CoC 9975, Rev 14. 



Office of Environmental Management

1000 Independence Ave. SW
Washington DC 20585
202-586-​7706

Federal Government